Cable

OWF Butendiek Cable LayingAbout 85 km of inter array cables are required to connect the 80 wind turbines to the offshore substation. Whilst the cables are manufactured by Draka in Sweden and Norway, the cable laying will be done by Visser & Smit Marine Contracting.