Grid Connection

GridConnectionThe grid connection of the Butendiek wind farm is part of Tennet’s Sylwin cluster which has the capacity of 864 MW and connects three wind farms west of Sylt. Butendiek’s offshore substation is connected with a 30 km sea cable to the Sylwin alpha platform. The energy is then transported via a 160 km sea cable and a 45 km land cable to the onshore converter station Brunsbüttel close to Hamburg.